The PRRC project has hired the TDS Group to conduct the feasibility study of the Cellular Dissemination System (CDS) within the framework of the Natio...
As part of the implementation of the Regional Climate Resilience Project (RCRP), a technical support and mid-term review mission will take place from...
On August 20, 2025, an official ceremony was held for the handover of computer equipment to the DGSC and DTM to strengthen the capacities of early war...
As part of the development of the PDU of Mutsamudu and Fomboni, Groupe Huit, in collaboration with the Ministry of Planning and the UGP-PRRC, is organ...
As part of the implementation of the PRRC project, the Sonede International / Hydro Plante Consortium has been contracted to carry out the APS,...
As part of the implementation of activities relating to rainwater drainage studies, the Regional Climate Resilience Project (PRRC) of the Ministry of...
As part of the implementation of the Regional Climate Resilience Project (PRRC), the Ministry of Territorial Planning, with the support of the Directo...
As part of the implementation of the contract with the Haskoning firm, a training workshop on Geographic Information Systems (GIS) was organized by th...
As part of the implementation of the Regional Climate Resilience Projects and PRPKR in the Union of Comoros, the HASKONING firm, mandated to carry out...